Slipway and Breakwater Reconstruction at Seacow Pond Small Craft Harbour, Prince Edward Island

Registry Search Mobile

Registry Search

Skip to Filters

6 results

Document End of Public Comment Period

  • Project Slipway and Breakwater Reconstruction at Seacow Pond Small Craft Harbour, Prince Edward Island
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2025-12-24
  • Document: 166486E.html
  • Relevance: 383.25
  • End of Public Comment Period December 24, 2025 – The public comment period on the project is closed. The Federal Authorities are considering comments received to date to inform its determination on whether carrying out of the project is likely to cause significant adverse environmental effects.
1 alternate format found
French HTML
  • Relevance: 332.25
  • Fin de la période de consultation publique 24 décembre 2025 - La période de commentaires du public sur le projet est maintenant terminée. Les autorités fédérales examinent  les commentaires reçus à ce jour afin de déterminer si l'exécution du projet est susceptible d'entraîner des effets environnementaux négatifs importants.

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Date modified: