Dry fire Hydrant in Range and Training Area (RTA) area 26 – Garrison Valcartier

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Dry fire Hydrant in Range and Training Area (RTA) area 26 – Garrison Valcartier
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2025-11-17
  • Document: 163779E.html
  • Relevance: 383.66
  • Notice of Determination November 17, 2025 The authorities have determined that the proposed ‘Dry fire Hydrant in Range and Training Area (RTA) area 26 – Garrison Valcartier' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; and technically and economically feasible ...
1 alternate format found
French HTML
  • Relevance: 332.66
  • Avis de détermination Le 17 novembre 2025 Les autorités ont déterminé que le projet proposé ‘Borne sèche secteur 26 des champs de tir et secteurs d'entraînement CTSE – Garnison Valcartier' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances communautaires; commentaires reçus du public; et les ...

Document Public Comment Period on Intent to Make a Determination

  • Project Dry fire Hydrant in Range and Training Area (RTA) area 26 – Garrison Valcartier
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2025-10-03
  • Document: 163375E.html
  • Relevance: 378.98
  • Public Comment Period on Intent to Make a Determination Dry fire Hydrant in Range and Training Area (RTA) area 26 – Garrison Valcartier October 3, 2025 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be ...
1 alternate format found
French HTML
  • Relevance: 327.98
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Borne sèche secteur 26 des champs de tir et secteurs d'entraînement CTSE – Garnison Valcartier Le 3 octobre 2025 — Le ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le ministère de la Défense nationale invite le public à formuler des ...