Rehabilitation of the Colonel By Drive Wall - Phase 2

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Intent to Make a Determination - Start of Public Comment Period

  • Project Rehabilitation of the Colonel By Drive Wall - Phase 2
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2024-08-30
  • Document: 158822E.html
  • Relevance: 400.76
  • Public Notice Rehabilitation of the Colonel By Drive Wall – Phase 2 – Public Comments Invited August 30, 2024 – The National Capital Commission must determine whether the proposed Phase 2 of the Colonel By Drive Wall rehabilitation project is likely to cause significant adverse environmental effects in compliance with sections 81-91 of the Impact Assessment Act and the National Capital Act.   To help inform this determination, the National Capital Commission is inviting comments from ...
1 alternate format found
French HTML
  • Relevance: 349.76
  • Avis public Réhabilitation du mur de la promenade Colonel-By - Phase 2 – Période de consultation publique Le 30 août 2024 – La Commission de la capitale nationale doit déterminer si le projet proposé la phase 2 du projet de réhabilitation du mur de la promenade Colonel-By est susceptible d'entraîner des effets négatifs importants sur l'environnement en vertu des articles 81 à 91 de la Loi sur l'Évaluation d'impact et de la Loi sur la capitale nationale.   Afin de contribuer à une prise ...

Document Figure 1 - Project Area

  • Project Rehabilitation of the Colonel By Drive Wall - Phase 2
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2024-08-30
  • Document: 158823E.pdf
  • Relevance: 400.76
  • COLONEL BY WALL REHABILITATION PHASE 2 CONTRACT NO. DC PROJECT NO. DC 491-01 REVISED PER TREE SURVEY (STRUCTURAL 66%) - 2024.03.26 LIST OF DRAWINGS COVER PAGE STRUCTURAL AND CIVIL S000 GENERAL NOTES, TREE PROTECTION NOTES & LAYDOWN AREA PLAN S101 SECTION 1 REMOVAL & NEW CONSTRUCTION PLANS 0+100.00 TO 0+140.00 S102 SECTION 2 REMOVAL & NEW CONSTRUCTION PLANS 0+140.00 TO 0+180.00 S103 SECTION 3 REMOVAL & NEW CONSTRUCTION PLANS 0+200.00 TO 0+250.00 S104 SECTION 1 REMOVAL & NEW ...
1 alternate format found
French PDF
  • Relevance: 349.76
  • COLONEL BY WALL REHABILITATION PHASE 2 CONTRACT NO. DC PROJECT NO. DC 491-01 REVISED PER TREE SURVEY (STRUCTURAL 66%) - 2024.03.26 LIST OF DRAWINGS COVER PAGE STRUCTURAL AND CIVIL S000 GENERAL NOTES, TREE PROTECTION NOTES & LAYDOWN AREA PLAN S101 SECTION 1 REMOVAL & NEW CONSTRUCTION PLANS 0+100.00 TO 0+140.00 S102 SECTION 2 REMOVAL & NEW CONSTRUCTION PLANS 0+140.00 TO 0+180.00 S103 SECTION 3 REMOVAL & NEW CONSTRUCTION PLANS 0+200.00 TO 0+250.00 S104 SECTION 1 REMOVAL & NEW ...