Remotely Piloted Aircraft System (RPAS) Infrastructure Project - 19 Wing Comox

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Remotely Piloted Aircraft System (RPAS) Infrastructure Project - 19 Wing Comox
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2024-10-15
  • Document: 159338E.html
  • Relevance: 344.35
  • Notice of Determination October 15, 2024 The Department of National Defence has determined that the proposed ‘Remotely Piloted Aircraft System (RPAS) Infrastructure Project - 19 Wing Comox' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; and technically and ...
1 alternate format found
French HTML
  • Relevance: 293.35
  • Avis de détermination Le 15 octobre 2024 Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Projet de l'infrastructure du système d'aéronef télépiloté (SATP) - 19 Escadre Comox' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances communautaires; commentaires reçus du public; ...

Document Public Comment Period on Intent to Make a Determination

  • Project Remotely Piloted Aircraft System (RPAS) Infrastructure Project - 19 Wing Comox
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2024-07-17
  • Document: 158166E.html
  • Relevance: 336.12
  • Public Comment Period on Intent to Make a Determination Remotely Piloted Aircraft System (RPAS) Infrastructure Project - 19 Wing Comox July 17, 2024 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered ...
1 alternate format found
French HTML
  • Relevance: 285.12
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Projet de l'infrastructure du système d'aéronef télépiloté (SATP) – 19 Escadre Comox Le 17 juillet 2024 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires sur cette ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Date modified: