Document Berry Point TCZ-2 and TCZ-3 Range Light Installations

  • Project Berry Point TCZ-2 and TCZ-3 Range Light Installations
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2024-02-09
  • Document: 159941E.html
  • Relevance: 322.14
  • Notice of Determination Burnaby, B.C. – February 9, 2024 - The Vancouver Fraser Port Authority has determined that the proposed Berry Point TCZ-2 and TCZ-3 Range Light Installations located approximately 100 metres off the coast of the Burnaby Refinery at Berry Point, in Burnaby is not likely to cause significant adverse environmental effects. The determination was based on a consideration of the following factors: Impacts on rights of Indigenous peoples Indigenous knowledge Community ...
1 alternate format found
French HTML
  • Relevance: 271.14
  • Avis de détermination Burnaby, C.-B. – 9 février 2024 – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition d'installation des feux d'alignement TCZ-2 et TCZ-3 à Berry Point, à environ 100 m du rivage devant la raffinerie de Burnaby à Berry Point, à Burnaby n'est pas susceptible d'avoir des effets négatifs importants sur l'environnement. Cette détermination a été obtenue en considérant les facteurs suivants : Effets sur les droits des peuples ...

Document Berry Point TCZ-2 and TCZ-3 Range Light Installations

  • Project Berry Point TCZ-2 and TCZ-3 Range Light Installations
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2023-11-21
  • Document: 153550E.html
  • Relevance: 315.42
  • Public notice  Berry Point TCZ-2 and TCZ-3 Range Light Installations – Public comments invited  November 21, 2023 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Berry Point TCZ-2 and TCZ-3 Range Light Installations, located approximately 100 m off the coast of the Burnaby Refinery at Berry Point, Burnaby within the Burrard Inlet are likely to cause significant adverse environmental effects.  To help inform ...
1 alternate format found
French HTML
  • Relevance: 264.42
  • Avis public  Installations des feux d'alignement TCZ-2 et TCZ-3 à Berry Point – Le public est invité à formuler des commentaires  Le 21 novembre 2023 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si le projet d'installation des feux d'alignement TCZ-2 et TCZ-3 à Berry Point, situé à environ 100 m du rivage devant la raffinerie de Burnaby à Berry Point, dans l'inlet Burrard, est susceptible ...