Document Notice of Determination
- Project Temporary Access Structure Construction, Abbott's Harbour Department of Fisheries and Oceans Small Craft Harbour, Yarmouth County, Nova Scotia
- Document Category: Additional Information
- Reference Number: 3
- Updated: 2023-09-19
- Document: 153054E.html
- Relevance: 369.31
- Notice of Determination September 19, 2023 – The Federal Authorities have issued their Notice of Determination after evaluation of the project, Temporary Access Structure Construction at the Abbott's Harbour DFO-SCH, and have determined that the project is not likely to cause significant adverse environmental effects and can therefore proceed. This determination was based on a consideration of the following ...
1 alternate format found
French HTML
- Relevance: 318.31
- Avis de décision 19 septembre 2023 - Les autorités fédérales ont émis leur avis de décision après l'évaluation du projet, Construction d'une structure d'accès temporaire au Abbott's Harbour MPO-PPB, et ont déterminé que le projet n'est pas susceptible d'entraîner des effets néfastes importants sur l'environnement et peut donc aller de ...