New Buoy Installation

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document New Buoy Installation

  • Project New Buoy Installation
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2023-09-14
  • Document: 153107E.html
  • Relevance: 368.82
  • Notice of Determination  Port Moody, B.C. –September 14, 2023– The Vancouver Fraser Port Authority has determined that the proposed New Buoy Installation located at in the Burrard Inlet within the water of Port Moody is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors:  Impacts on rights of Indigenous ...
1 alternate format found
French HTML
  • Relevance: 317.82
  • Avis de détermination  Port Moody, C.-B. – 14 septembre 2023 – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition de projet d'installation d'une nouvelle bouée, située dans l'inlet Burrard au sein des eaux de Port Moody (C.-B.), n'est pas susceptible d'entraîner des effets néfastes importants pour ...

Document New Buoy Installation

  • Project New Buoy Installation
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2023-07-11
  • Document: 152350E.html
  • Relevance: 362.36
  • Public notice  New Buoy Installation – Public comments invited  July 11, 2023 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed New Buoy Installation, located in the Burrard Inlet within the waters of Port Moody, BC is likely to cause significant adverse environmental effects.  To help inform this determination and a decision on whether to approve the proposed project, the Vancouver Fraser Port Authority is ...
1 alternate format found
French HTML
  • Relevance: 311.36
  • Avis public  Installation d'une nouvelle bouée – Le public est invité à formuler des commentaires.  Le 11 juillet 2023 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si la proposition d'installation d'une nouvelle bouée, située dans l'inlet Burrard au sein des eaux de Port Moody (C.-B.), est susceptible d'entraîner des effets environnementaux néfastes importants. Pour éclairer cette détermination ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: