Berens River Bridge Replacement

Registry Search Mobile

Registry Search

Skip to Filters

6 results

Document Notice of Determination

  • Project Berens River Bridge Replacement
  • Document Category: Additional Information
  • Reference Number: 3
  • Document Date: 2024-10-31
  • Document: 159524E.html
  • Relevance: 346.62
  • Notice of Determination Winnipeg – October 31, 2024 – Indigenous Services Canada has determined that the proposed Berens River Bridge Replacement is not likely to cause significant adverse environmental effects. Indigenous Services Canada is satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects. Therefore, Indigenous Services Canada may carry out the project, exercise any power, perform any duty or function, or provide ...
1 alternate format found
French HTML
  • Relevance: 295.62
  • Avis de décision Winnipeg – 31 octobre, 2024 – Les Services aux Autochtones Canada ont déterminé que le projet remplacement du pontde la rivière Berens n'est pas susceptible de causer des effets négatifs importants sur l'environnement. Les Services aux Autochtones Canada sont convaincu que le projet est peu susceptible de causer des effets négatifs sur l'environnement. Par conséquent, les Services aux Autochtones Canada peuvent réaliser le projet, exercer tout pouvoir, exercer toute ...

Document Relocation of Electrical Distribution Line Related to Bridge Replacement Project

  • Project Berens River Bridge Replacement
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2024-07-15
  • Document: 158105E.pdf
  • Relevance: 336.69
  • gstark Oval Berens River Br id ge sgmiterek Typewritten Text PRELIMINARY - NOT TO BE USED FOR CONSTRUCTION sgmiterek Rectangle sgmiterek Text Box 2022 11 04 sgmiterek Typewritten Text RELOCATE 66KV WITH 12KV UNDERBUILD ACROSS THE BERENS RIVER AND TO ACCOMODATE NEW ROAD ALIGNMENT sgmiterek Typewritten Text sgmiterek Text Box SIDE GUYS OR X BRACING REQUIRED sgmiterek Text Box SIDE GUYS OR X BRACING REQUIRED
1 alternate format found
French PDF
  • Relevance: 285.69
  • gstark Oval Berens River Br id ge sgmiterek Typewritten Text PRELIMINARY - NOT TO BE USED FOR CONSTRUCTION sgmiterek Rectangle sgmiterek Text Box 2022 11 04 sgmiterek Typewritten Text RELOCATE 66KV WITH 12KV UNDERBUILD ACROSS THE BERENS RIVER AND TO ACCOMODATE NEW ROAD ALIGNMENT sgmiterek Typewritten Text sgmiterek Text Box SIDE GUYS OR X BRACING REQUIRED sgmiterek Text Box SIDE GUYS OR X BRACING REQUIRED

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Date modified: