Document Notice of Determination

  • Project Construct New Steel Fabricated Shelter WP1377 at Work Point - Canadian Forces Base (CFB) Esquimalt
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2025-04-09
  • Document: 161301E.html
  • Relevance: 361.1
  • Notice of Determination April 9, 2025 The authorities have determined that the proposed ‘Construct New Steel Fabricated Shelter WP1377 at Work Point - Canadian Forces Base (CFB) Esquimalt" project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; and technically and ...
1 alternate format found
French HTML
  • Relevance: 310.1
  • Avis de détermination Le 9 avril 2025 Les autorités ont déterminé que le projet proposé ‘Construction d'un nouvel abri en acier WP1377 à Work Point - Base des Forces canadiennes (BFC) Esquimalt' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances communautaires; commentaires reçus du public; ...

Document Public Comment Period on Intent to Make a Determination

  • Project Construct New Steel Fabricated Shelter WP1377 at Work Point - Canadian Forces Base (CFB) Esquimalt
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2022-09-29
  • Document: 145185E.html
  • Relevance: 283.39
  • Public Comment Period on Intent to Make a Determination Construct New Steel Fabricated Shelter WP1377 at Work Point – Canadian Forces Base (CFB) Esquimalt September 29, 2022 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments ...
1 alternate format found
French HTML
  • Relevance: 232.39
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Construction d'un nouvel abri en acier WP1377 à Work Point - Base des Forces canadiennes (BFC) Esquimalt Le 29 septembre 2022 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des ...