Construct New Sprung Shelter Building at CFB Esquimalt Dockyard

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Construct New Sprung Shelter Building at CFB Esquimalt Dockyard
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2025-10-30
  • Document: 163676E.html
  • Relevance: 381.74
  • Notice of Determination October 30 2025 The authorities have determined that the proposed ‘Construct New Sprung Shelter Building at CFB Esquimalt Dockyard' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; and technically and economically feasible mitigation ...
1 alternate format found
French HTML
  • Relevance: 330.74
  • Avis de détermination Le 30 octobre 2025 Les autorités ont déterminé que le projet proposé ‘Construction d'un nouvel abri Sprung à la BFC Esquimalt (arsenal maritime)' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances communautaires; commentaires reçus du public; et les mesures d'atténuation ...

Document Public Comment Period on Intent to Make a Determination

  • Project Construct New Sprung Shelter Building at CFB Esquimalt Dockyard
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2021-12-21
  • Document: 142460E.html
  • Relevance: 264.76
  • Public Comment Period on Intent to Make a Determination Construct New Sprung Shelter Building at CFB Esquimalt Dockyard December 21 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For ...
1 alternate format found
French HTML
  • Relevance: 213.76
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Construction d'un nouvel abri Sprung à la BFC Esquimalt (arsenal maritime) Le 21 décembre 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires sur cette ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Date modified: