Camp Canada Power Distribution Upgrade, Operation IMPACT - Camp Canada, Ali Al-Salem Air Base, Kuwait

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Camp Canada Power Distribution Upgrade, Operation IMPACT - Camp Canada, Ali Al-Salem Air Base, Kuwait
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2022-01-10
  • Document: 142536E.html
  • Relevance: 265.96
  • Notice of Determination January 10, 2022 – Camp Canada, Ali Al-Salem Air Base, Kuwait The Department of National Defence has determined that the proposed ‘Camp Canada Power Distribution Upgrade, Operation IMPACT' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: technically and economically feasible mitigation measures. The Department of National Defence is satisfied that that the ...
1 alternate format found
French HTML
  • Relevance: 214.96
  • Avis de détermination Le 10 janvier 2022 – Camp Canada, Ali Al-Salem Air Base, Koweït Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Camp Canada, Amélioration du réseau de distribution électrique, Opération IMPACT' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : les mesures d'atténuation réalisables, sur les plans technique et économique Le Ministère de la ...

Document Public Comment Period on Intent to Make a Determination

  • Project Camp Canada Power Distribution Upgrade, Operation IMPACT - Camp Canada, Ali Al-Salem Air Base, Kuwait
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2021-12-08
  • Document: 142344E.html
  • Relevance: 263.91
  • Public Comment Period on Intent to Make a Determination Camp Canada Power Distribution Upgrade, Operation IMPACT - Camp Canada, Ali Al-Salem Air Base, Kuwait December 8, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments ...
1 alternate format found
French HTML
  • Relevance: 212.91
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Camp Canada, Amélioration du réseau de distribution électrique, Opération IMPACT - Camp Canada, Ali Al-Salem Air Base, Koweït. Le 8 décembre 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Date modified: