Amendment to the construction hours in respect to condition 15 of the approved Golden Ears Forcemain (GDEFM) (PER No. 20-163)

Registry Search Mobile

Registry Search

Skip to Filters

6 results

Document Golden Ears Forcemain (GDEFM) Project

  • Project Amendment to the construction hours in respect to condition 15 of the approved Golden Ears Forcemain (GDEFM) (PER No. 20-163)
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2020-11-30
  • Document: 137138E.html
  • Relevance: 243.5
  • Notice of Determination – Golden Ears Forcemain (GDEFM) Project Langley, B.C. – November 30, 2020 – The Vancouver Fraser Port Authority has determined that the proposed Golden Ears Forcemain (GDEFM) Project, located approximately 250 metres west of the Golden Ears Bridge, is not likely to cause significant adverse environmental effects.  This determination was based on a consideration of the following factors:  Impacts on rights of Indigenous peoples   Indigenous ...
1 alternate format found
French HTML
  • Relevance: 192.5
  • Avis de détermination – Projet de conduite de refoulement Golden Ears Langley, C.-B. – 30 novembre – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition de projet de conduite de refoulement Golden Ears, situé environ 250 mètres à l'ouest du pont Golden Ears, n'est pas susceptible d'entraîner des effets néfastes importants pour l'environnement.  Cette détermination a été obtenue en considérant les facteurs suivants :?  Effets sur les droits des peuples ...

Document Golden Ears Forcemain Project

  • Project Amendment to the construction hours in respect to condition 15 of the approved Golden Ears Forcemain (GDEFM) (PER No. 20-163)
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2020-09-16
  • Document: 136023E.html
  • Relevance: 239.8
  • Public Notice Golden Ears Forcemain (GDEFM) Project - Public Comments Invited September 16, 2020 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Golden Ears Forcemain (GDEFM) Project, located at approximately 250 metres west of the Golden Ears Bridge is likely to cause significant adverse environmental effects. To help inform this determination and a decision on whether or not to approve the proposed ...
1 alternate format found
French HTML
  • Relevance: 188.8
  • Avis public Projet de conduite de refoulement Golden Ears – Le public est invité à formuler des commentaires. 16 septembre 2020 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si le projet proposé de conduite de refoulement Golden Ears, situé environ 250 mètres à l'ouest du pont Golden Ears, est susceptible d'entraîner des effets néfastes importants sur l'environnement. Pour éclairer cette ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Date modified: