Main Street Road Restoration

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Main Street Road Restoration
  • Document Category: Additional Information
  • Reference Number: 3
  • Updated: 2020-07-06
  • Document: 135297E.html
  • Relevance: 279.6
  • Notice of Determination Ottawa – July 6, 2020 – Infrastructure Canada and Indigenous Services Canada have determined that the proposed Main Street Road Restoration project in Tobique Narrows, New Brunswick: Is not likely to cause significant adverse environmental effects This determination was based on a consideration of the following factors: Impacts on rights of Indigenous peoples; Indigenous knowledge; Community knowledge; Comments received from the public; and ...
1 alternate format found
French HTML
  • Relevance: 228.6
  • Avis de détermination Ottawa – le 6 juillet, 2020 – Infrastructure Canada et Services aux Autochtones Canada ont déterminé que le projet de la réfection de la rue Main Street à Tobique Narrows, Nouveau-Brunswick : n'est pas susceptible de causer des effets négatifs importants sur l'environnement Cette détermination reposait sur les facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances communautaires; commentaires ...

Document Public Notice - Notice of Intent

  • Project Main Street Road Restoration
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-05-20
  • Document: 135295E.html
  • Relevance: 276.4
  • Public Notice Main Street Road Restoration - Public Comments Invited May 20, 2020 - Infrastructure Canada must determine whether the proposed Main Street Road Restoration project, located in the Tobique First Nation Reserve, is likely to cause significant adverse environmental effects. To help inform this determination, Infrastructure Canada is inviting comments from the public respecting that determination. All comments received will be considered ...
1 alternate format found
French HTML
  • Relevance: 225.4
  • Avis public Refection de la rue Main - Periode de consultation publique 20 mai, 2020 - Infrastructure Canada doit déterminer si le projet proposé Refection de la rue Main, situé au reserve de Tobique First Nation est susceptible d'entraîner des effets négatifs importants sur l'environnement.  Afin de contribuer à une prise de détermination éclairée, Infrastructure Canada ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: