Schnitzer Fire Suppression Project - Design Amendment

Registry Search Mobile

Registry Search

Skip to Filters

8 results

Document Schnitzer Fire Suppression Project - Design Amendment

  • Project Schnitzer Fire Suppression Project - Design Amendment
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2020-06-25
  • Document: 135305E.html
  • Relevance: 277.34
  • Notice of Determination Surrey, B.C. – June 25, 2020 – The Vancouver Fraser Port Authority has determined that the proposed Schnitzer Fire Suppression Project – Design Amendment is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: Impacts on rights of Indigenous peoples Indigenous knowledge Community knowledge Comments received from the public Technically and economically feasible mitigation ...
1 alternate format found
French HTML
  • Relevance: 226.34
  • Avis de détermination Surrey, C.-B. – 25 juin 2020– L'Administration portuaire Vancouver-Fraser a déterminé que la modification proposée à la conception du système approuvé d'extinction d'incendie Schnitzer n'est pas susceptible d'entraîner des effets néfastes importants pour l'environnement. Cette détermination a été obtenue en considérant les facteurs suivants : Effets sur les droits des peuples autochtones Connaissances autochtones Connaissances communautaires Commentaires reçus de ...

Document Schnitzer Fire Suppression Project - Design Amendment

  • Project Schnitzer Fire Suppression Project - Design Amendment
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-04-17
  • Document: 134603E.html
  • Relevance: 272.74
  • Public Notice Schnitzer Fire Suppression Project - Design Amendment - Public Comments Invited April 17, 2020 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed amendment to the design of the approved the Schnitzer Fire Suppression System (PER No. 18-196-01), located in Surrey, BC, is likely to cause significant adverse environmental effects. Written comments must be submitted by May 16, 2020. To help inform ...
1 alternate format found
French HTML
  • Relevance: 221.74
  • Avis public Projet de système d'extinction d'incendie Schnitzer – Modification à la conception – Le public est invité à formuler des commentaires. 17 avril 2020 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si la modification proposée à la conception du système approuvé d'extinction d'incendie Schnitzer (PER No 18-196-01), situé à Surrey (C.-B.) est susceptible d'entraîner des effets néfastes ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: