About the results
Additional documents may be available upon request. To obtain a copy, please see the project page for contact information.
Information provided by external sources may not be subject to the Official Languages Act and is made available in the language(s) provided. This may result in content being displayed in a language different than that of the web page display.
The result count may differ from the number of unique comments. Similar comments by various authors may be grouped as a single comment; while each comment and attachment count as distinct results. Where applicable, please click on the alternate formats link to view additional versions available.
Kemess Underground Project
Document Notice - Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024
- Project Kemess Underground Project
- Document Category: Additional Information
- Reference Number: 38
- Document Date: 2024-07-18
- Document: 158165E.html
- Relevance: 336.99
- Notice — Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024 July 18, 2024 The Minister of the Environment has determined, pursuant to section 306 of the Budget Implementation Act, 2024, that the Decision Statements issued for the 36 Designated Projects listed below contain conditions that could have been included in a Decision Statement issued under subsection 65(1) of the amended Impact Assessment Act (IAA). This determination was made in ...
1 alternate format found
French HTML
- Relevance: 285.99
- Avis — Transition des déclarations de décision au titre de l'article 306 de la Loi d'exécution du budget de 2024 18 juillet 2024 Le ministre de l'Environnement a déterminé, conformément à l'article 306 de la Loi d'exécution du budget de 2024, que les déclarations de décision émises pour les 36 projets désignés énumérés ci-dessous contiennent des conditions qui auraient pu être incluses dans une déclaration de décision publiée en vertu du paragraphe 65(1) de la Loi sur l'évaluation d'impact ...
Document Résumé d'inspection
- Project Kemess Underground Project
- Document Category: Additional Information
- Reference Number: 39
- Document Date: 2023-07-04
- Document: 158919F.pdf
- Relevance: 253.82
- 160 Elgin St., 22nd floor 160, rue Elgin, 22e étage Ottawa ON K1A 0H3 Ottawa ON K1A 0H3 www.canada.ca/iaac www.canada.ca/aeic RÉSUMÉ DE L'INSPECTION Nom du projet : Projet de la mine souterraine Kemess Nom du promoteur : AuRico Metal inc. Date de l'inspection : 4 au 6 juillet 2023 Description du projet : AuRico Metals Inc. propose d'aménager et d'exploiter le projet de la mine ...
1 alternate format found
French HTML
- Relevance: 253.82
- Résumé de l'inspection Nom du projet : Projet de la mine souterraine Kemess Nom du promoteur : AuRico Metal inc. Date de l'inspection : 4 au 6 juillet 2023 Description du projet : AuRico Metals Inc. propose d'aménager et d'exploiter le projet de la mine souterraine Kemess, une mine d'or et de cuivre située à environ 250 kilomètres au nord de Smithers et à 430 kilomètres au nord-ouest de Prince George, en Colombie-Britannique. Tel que proposé, le projet devrait avoir une capacité de ...
Document Amended Decision Statement
- Project Kemess Underground Project
- Document Category: Additional Information
- Reference Number: 31
- Document Date: 2021-01-26
- Document: 137914E.pdf
- Relevance: 246.49
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to AuRico Metals Inc. c/o Sean Masse, Project Manager 1 University Ave, Suite 1500 Toronto, Canada M5J 1P1 for the Kemess Underground Project Description of the Designated Project AuRico Metals Inc. is proposing the construction and operation of the Kemess Underground Project, an underground gold-copper mine located approximately 250 kilometres north of ...
3 alternate formats found
English HTML
- Relevance: 246.49
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to AuRico Metals Inc. c/o Sean Masse, Project Manager 1 University Ave, Suite 1500 Toronto, Canada M5J 1P1 for the Kemess Underground Project Description of the Designated Project AuRico Metals Inc. is proposing the construction and operation of the Kemess Underground Project, an underground gold-copper mine located approximately 250 kilometres north of Smithers and 430 kilometres ...
French HTML
- Relevance: 195.49
- Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à AuRico Metals Inc. a/s de Sean Masse, Gestionnaire de projet 1, avenue University, suite 1500 Toronto, Canada M5J 1P1 pour le Projet de la mine souterraine Kemess Description du projet désigné AuRico Metals Inc. propose de construire et d'exploiter le projet de la mine souterraine Kemess, une mine d'or et de cuivre située à environ 250 kilomètres au nord de ...
French PDF
- Relevance: 195.49
- Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à AuRico Metals Inc. a/s de Sean Masse, Gestionnaire de projet 1, avenue University, suite 1500 Toronto, Canada M5J 1P1 pour le Projet de la mine souterraine Kemess Description du projet désigné AuRico Metals Inc. propose de construire et d'exploiter le projet de la mine souterraine Kemess, une mine d'or et de cuivre située à environ ...
Document Public Notice - Federal Funding Allocated to Participate in the Environmental Assessment
- Project Kemess Underground Project
- Document Category: Additional Information
- Reference Number: 29
- Document Date: 2021-01-15
- Document: 137706E.html
- Relevance: 245.92
- Public Notice Kemess Underground Project - Participant Funding Allocated The Impact Assessment Agency of Canada allocated additional federal funds to the following recipients to assist their participation in specific activities related to the environmental assessment by substitution for this proposed project. Details of Funding Allocation for the Project Recipients Additional Funding Allocation Previous Funding Allocation Total Funding Allocation McLeod Lake Indian Band N/A $ 12,300.00 $ ...
1 alternate format found
French HTML
- Relevance: 194.92
- Avis public Projet de la mine souterraine Kemess — Attribution d'une aide financière aux participants L'Agence d'évaluation d'impact du Canada a attribué de l'aide financière fédérale additionnelle aux bénéficiaires suivants pour favoriser leur participation à des activités précises liées à l'évaluation environnementale de substitution pour ce projet. Répartition de l'aide financière pour le projet Bénéficiaires Aide financière additionnelle Aide financière initiale Aide financière ...
Document Analysis of AuRico Metals Inc. Proposed Changes to the Kemess Underground Project
- Project Kemess Underground Project
- Document Category: Additional Information
- Reference Number: 30
- Document Date: 2020-12-31
- Document: 137913E.pdf
- Relevance: 245.14
- Impact Assessment Agency of Canada ANALYSIS OF AURICO METALS INC.’S PROPOSED CHANGES TO THE KEMESS UNDERGROUND PROJECT (DECEMBER 2020) Impact Assessment Agency of Canada Agence d’évaluation d’impact du Canada 2 Table of Contents List of Figures ......................................................................................................................... 4 1. Introduction ...
1 alternate format found
French PDF
- Relevance: 194.14
- Agence d’évaluation d’impact du Canada ANALYSE DES CHANGEMENTS PROPOSÉS PAR AURICO METALS INC. AU PROJET DE LA MINE SOUTERRAINE KEMESS (DÉCEMBRE 2020) Agence d’évaluation d’impact du Canada Impact Assessment Agency of Canada 2 Table des matières Agence d’évaluation d’impact du Canada .............................................................................. 1 Table des matières ...
Document Inspection Summary: September 14, 2020 - September 17, 2020
- Project Kemess Underground Project
- Document Category: Additional Information
- Reference Number: 27
- Document Date: 2020-10-15
- Document: 136397E.pdf
- Relevance: 241.27
- 160 Elgin St., 22nd floor 160, rue Elgin, 22e étage Ottawa ON K1A 0H3 Ottawa ON K1A 0H3 www.canada.ca/iaac www.canada.ca/aeic INSPECTION SUMMARY Project Name: Kemess Underground Project Proponent Name: Aurico Metals Inspection Date: September 14, 2020 to September 17, 2020 Project Description: Aurico Metals Inc. is proposing the construction and operation of the Kemess Underground Project, an ...
1 alternate format found
French PDF
- Relevance: 190.27
- 160 Elgin St., 22nd floor 160, rue Elgin, 22e étage Ottawa ON K1A 0H3 Ottawa ON K1A 0H3 [AP_RequestNumberWithInitials] RÉSUMÉ DE L’INSPECTION Nom du projet : Projet de la mine souterraine Kemess Nom du promoteur : Aurico Metals inc. Date d’inspection : Du 14 au 17 septembre 2020 Description du projet Aurico Metals inc. propose la construction et l’exploitation du projet de la mine souterraine ...
Document Public Notice - Public Comments Invited
- Project Kemess Underground Project
- Document Category: For Public Participation
- Reference Number: 22
- Document Date: 2020-08-17
- Document: 135699E.html
- Relevance: 238.42
- Public Notice Kemess Underground Project — Public Comments Invited What is happening? August 17, 2020 — The Impact Assessment Agency of Canada (the Agency) is holding a public comment period as part of the post-decision phase for the Kemess Underground Project, an underground gold-copper mine located approximately 250 kilometres north of Smithers and 430 kilometres northwest of Prince George, British Columbia. Why is the Agency holding a public comment period? In March 2017, the ...
1 alternate format found
French HTML
- Relevance: 187.42
- Avis public Projet de la mine souterraine Kemess — Période de consultation publique Que se passe-t-il? Le 17 août 2020 — L'Agence d'évaluation d'impact du Canada (l'Agence) lance une période de consultation publique dans le cadre de la phase suivant la décision relative au projet de la mine souterraine Kemess, une mine souterraine d'or et de cuivre située à environ 250 kilomètres au nord de Smithers et à 430 kilomètres au nord-ouest de Prince George, en Colombie-Britannique. Pourquoi ...
Document News Release - Public Comments Invited
- Project Kemess Underground Project
- Document Category: News Releases
- Reference Number: 23
- Document Date: 2020-08-17
- Document: 135700E.html
- Relevance: 238.42
- News Release Kemess Underground Project — Public Comments Invited August 17, 2020 — Ottawa — Impact Assessment Agency of Canada The Impact Assessment Agency of Canada (the Agency) is holding a public comment period as part of the post-decision phase for the Kemess Underground Project, an underground gold-copper mine located approximately 250 kilometres north of Smithers and 430 kilometres northwest of Prince George, British Columbia. In March 2017, the Minister of Environment and Climate ...
1 alternate format found
French HTML
- Relevance: 187.42
- Communiqué de presse Projet de la mine souterraine Kemess — Période de consultation publique Le 17 août 2020 — Ottawa — Agence d'évaluation d'impact du Canada L'Agence d'évaluation d'impact du Canada (l'Agence) lance une période de consultation publique dans le cadre de la phase suivant la décision relative au projet de la mine souterraine Kemess, une mine souterraine d'or et de cuivre située à environ 250 kilomètres au nord de Smithers et à 430 kilomètres au nord-ouest de Prince George, ...
Document Draft Analysis of AuRico Metals Inc.'s Proposed Changes to the Kemess Underground Project (August 2020)
- Project Kemess Underground Project
- Document Category: Additional Information
- Reference Number: 25
- Document Date: 2020-08-17
- Document: 135746E.pdf
- Relevance: 238.42
- Impact Assessment Agency of Canada DRAFT ANALYSIS OF AURICO METALS INC.’S PROPOSED CHANGES TO THE KEMESS UNDERGROUND PROJECT (AUGUST 2020) Impact Assessment Agency of Canada Agence d’évaluation d’impact du Canada 2 Table of Contents Impact Assessment Agency of Canada ................................................................................. 1 Table of Contents ...
1 alternate format found
French PDF
- Relevance: 187.42
- Agence d’évaluation d’impact du Canada VERSION PROVISOIRE – ANALYSE DES CHANGEMENTS PROPOSÉS PAR AURICO METALS INC. AU PROJET DE LA MINE SOUTERRAINE KEMESS (AOÛT 2020) Agence d’évaluation d’impact du Canada Impact Assessment Agency of Canada 2 Table des matières Agence d’évaluation d’impact du Canada .............................................................................. 1 Table des matières ...
Document Draft Amended Decision Statement
- Project Kemess Underground Project
- Document Category: Additional Information
- Reference Number: 24
- Document Date: 2020-08-17
- Document: 135733E.pdf
- Relevance: 238.42
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to AuRico Metals Inc. c/o Sean Masse, Project Manager 1 University Ave, Suite 1500 Toronto, Canada M5J 1P1 for the Kemess Underground Project Description of the Designated Project AuRico Metals Inc. is proposing the construction and operation of the Kemess Underground Project, an underground gold-copper mine located approximately 250 kilometres north of ...
3 alternate formats found
English HTML
- Relevance: 238.42
- (Draft) Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to AuRico Metals Inc. c/o Sean Masse, Project Manager 1 University Ave, Suite 1500 Toronto, Canada M5J 1P1 for the Kemess Underground Project Description of the Designated Project AuRico Metals Inc. is proposing the construction and operation of the Kemess Underground Project, an underground gold-copper mine located approximately 250 kilometres north of Smithers and 430 ...
French HTML
- Relevance: 187.42
- (Ebauche) Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à AuRico Metals Inc. a/s de Sean Masse, Gestionnaire de projet 1, avenue University, suite 1500 Toronto, Canada M5J 1P1 pour le Projet de la mine souterraine Kemess Description du projet désigné AuRico Metals Inc. propose de construire et d'exploiter le projet de la mine souterraine Kemess, une mine d'or et de cuivre située à environ 250 kilomètres au ...
French PDF
- Relevance: 187.42
- Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à AuRico Metals Inc. a/s de Sean Masse, Gestionnaire de projet 1, avenue University, suite 1500 Toronto, Canada M5J 1P1 pour le Projet de la mine souterraine Kemess Description du projet désigné AuRico Metals Inc. propose de construire et d'exploiter le projet de la mine souterraine Kemess, une mine d'or et de cuivre située à ...
Document Analysis on AuRico Metals Inc.'s Application for an Amendment to Environmental Assessment Certificate #M17-01
- Project Kemess Underground Project
- Document Category: Additional Information
- Reference Number: 15
- Document Date: 2018-08-16
- Document: 124928E.html
- Relevance: 211.76
- Analysis on AuRico Metals Inc.'s Application for an Amendment to Environmental Assessment Certificate #M17-01 Kemess Underground Project August 2018 Table of Contents 1 Introduction 1.1 Structure of the Document 2 Proposed Project Design Changes 2.1 Additional use of Existing Fuel Storage Infrastructure 2.2 Realignment of the Exhaust Ventilation Raise Access Road 2.3 Additional Overburden/Soil Stockpiles 2.4 New Road to Connect the Kemess Underground Access Corridor to the ...
1 alternate format found
English PDF
- Relevance: 211.76
- Analysis on AuRico Metals Inc.’s Application for an Amendment to Environmental Assessment Certificate #M17-01 Kemess Underground Project August 2018 Table of Contents 1 Introduction .............................................................................................................................. 4 1.1 Structure of the Document ........................................................................................... 5 2 Proposed Project Design Changes ...
Document Environmental Assessment Decision Statement
- Project Kemess Underground Project
- Document Category: Additional Information
- Reference Number: 12
- Document Date: 2017-03-09
- Document: 118286E.pdf
- Relevance: 202.55
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to AuRico Metals Inc. c/o Harold Bent, Director, Environment 1076 Main Street, Suite 2 Smithers, British Columbia V0J 2N0 for the Kemess Underground Project Description of the Designated Project AuRico Metals Inc. is proposing the construction and operation of the Kemess Underground Project, an underground gold-copper mine located approximately 250 ...
1 alternate format found
English HTML
- Relevance: 202.55
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to AuRico Metals Inc. c/o Harold Bent, Director, Environment 1076 Main Street, Suite 2 Smithers, British Columbia V0J 2N0 for the Kemess Underground Project Description of the Designated Project AuRico Metals Inc. is proposing the construction and operation of the Kemess Underground Project, an underground gold-copper mine located approximately 250 kilometres north of Smithers and 430 ...
Document Environmental Assessment Decision Statement (Revised due to change of proponent)
- Project Kemess Underground Project
- Document Category: Additional Information
- Reference Number: 16
- Document Date: 2017-03-09
- Document: 124555E.pdf
- Relevance: 202.55
- ...
1 alternate format found
English HTML
- Relevance: 202.55
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to AuRico Metals Inc. c/o Sean Masse, Project Manager 1 University Ave, Suite 1500 Toronto, Canada M5J 1P1 for the Kemess Underground Project Description of the Designated Project AuRico Metals Inc. is proposing the construction and operation of the Kemess Underground Project, an underground gold-copper mine located approximately 250 kilometres north of Smithers and 430 kilometres ...