Public Comment Period on Intent to Make a Determination
Construction of the Canadian Multi-Mission Aircraft (CMMA) Aircraft Maintenance Hangar – 14 Wing Greenwood

April 1, 2026 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by April 20, 2026 to:
Theo Eastmond, Project Manager
Mailing Address:  60 Moodie Drive
Ottawa ON K1A 0K2
E-mail: theodore.eastmond@forces.gc.ca

The Proposed Project

The Department of National Defence (DND) proposes the construction of a new Aircraft Maintenance Hangar at 14 Wing Greenwood as part of the Canadian Multi Mission Aircraft (CMMA) program. The facility will include a six bay aircraft maintenance hangar with two second line bays, and four first line bays. Supporting infrastructure will include workshops, storage areas, administrative offices, personnel parking, and airfield aprons connecting the hangar to aircraft movement areas.

Project activities will include site preparation, excavation, building construction, installation of related utilities and infrastructure, soil and groundwater management, and landscaping. Work will be completed on DND property, within the Airfield Operations Zone (AOZ). Several buildings within the potential construction footprint may require demolition. Two of the buildings (Hangar 9 and Hangar 10) are Recognized Federal Heritage Buildings, and their potential demolition is included within the scope of this assessment. Demolition activities will include hazardous materials abatement, structural removal, and site reinstatement. The exact location of the new CMMA Aircraft Maintenance Hangar is currently under options analysis, and the final siting decision will be confirmed at a later stage.

One siting option being assessed would require the relocation of the Union Church Cemetery, located east of Hangar 9. If this option proceeds, cemetery relocation would occur prior to demolition and construction activities.

Additional opportunities exist to provide input to the feasibility study for the potential Union Church Cemetery relocation. Please follow the link for the Public Notice which provides additional information on the feasibility study and contact information if you have ancestors interred at the cemetery.

Document reference number: 1