June 25, 2025 – The Greater Toronto Airports Authority (GTAA) must determine whether the proposed Terminal 3 Aircraft Gating Equipment Replacement Project located at Toronto Pearson International Airport is likely to cause significant adverse environmental effects. To help inform this determination, the GTAA is inviting comments from the public respecting that determination. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.
Written comments must be submitted by July 25, 2025 to:
Greater Toronto Airports Authority
3111 Convair Drive; Toronto AMF, ON; L5P 1B2
Email address: environment@gtaa.com
The Proposed Project: Terminal 3 Aircraft Gating Equipment Replacement
This project involves the replacement of aircraft gate equipment at six priority gates along Pier C at Terminal 3. The scope of work for the project includes the removal and replacement of passenger boarding bridges, pre-conditioned air units, ground power units and potable water cabinets. Additionally, a hose retraction system will be added to all gates. Supporting building infrastructure (electrical/mechanical/civil) will be replaced to support the new gate equipment. Bollards and guardrails will also be installed around the equipment. The project is expected to begin Fall 2025.
Document reference number: 1