Public Notice (Correction)

July 30, 2025 – Innovation, Science and Economic Development Canada must determine whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this determination, Innovation, Science and Economic Development Canada is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.

Written comments must be submitted by August 29, 2025 to contact identified on the project page.

The Proposed Project

Kawacatoose First Nation is proposing the construction of 8 telecommunication towers to provide high-speed Internet access to the Kawacatoose First Nation. The towers will be 96 feet tall. Antennas will be mounted at the top of these towers. These antennas will operate in the 5 GHz frequency bands. All of the equipment necessary to operate this facility will be housed in a small equipment cabinet located on-site. These towers may undergo future modifications or the addition/replacement of antennas.

Document reference number: 2

Date modified: