Saskatoon Airport Solar -  1MW Project - Public Comments Invited

03/02/2025 - The Saskatoon Airport Authority (SAA) must determine whether the proposed 1MW solar project located at the northeastern side of airport lands, is likely to cause significant adverse environmental effects. 

To help inform this determination, the Saskatoon Airport Authority is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online. 

Written comments must be submitted by 05/03/2025 to:


Eric Desnoyers-Saskatoon Airport Authority

2535 Airport Road, Saskatoon, SK Canada S7L 1M4

1 (306) 975-4242 x 4112

eric@yxe.ca


The Proposed Project

This project involves the design build of a 1MW ground mounted solar facility on airport lands. Site preparation activities will include geo-technical studies, surveys, and environmental studies.

The Saskatoon Airport Authority is responsible for the management, operation and development of the Saskatoon John G. Diefenbaker International Airport and as such, is the lead authority on this project.

Environmental description includes greenfield surrounded by industrial/commercial land. 

 

Document reference number: 1