Public Notice

Sir William Logan Building Electric Vehicle Charging Station Modification – Public Comments Invited

December 3, 2024 – The authorities must determine whether the proposed Sir William Logan Building Electric Vehicle Charging Station Modification, located in Ottawa is likely to cause significant adverse environmental effects.

To help inform this determination, the authorities are inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.

Written comments must be submitted by January 3, 2024 to:

Environment, Health and Safety

Public Services and Procurement Canada

11 Laurier St, Portage III, Place du Portage
Gatineau, QC  K1A 0S5

Email: TPSGC.RCNLVEEListedeControle-NCRECMPChecklist.PWGSC@tpsgc-pwgsc.gc.ca

 

The Proposed Project

Modify existing EV charging stations in front of Sir William Logan Building Electric Vehicle Charging Station Modification, bases, sidewalks and curbs as required to meet code requirements. There are 4x plugs on 2 bases in the grass median of the lot that should be modified to have a concrete walking surface with access to both sides of the median. Both bases must be modified as needed to meet applicable accessibility requirements for height, access etc.

Document reference number: 1

Date modified: