Public Notice

100 Sparks / 30 Metcalfe Redevelopment Project – Public Comments Invited

October 11, 2024 – The authorities must determine whether the proposed 100 Sparks / 30 Metcalfe Redevelopment Project, located in Ottawa is likely to cause significant adverse environmental effects.

To help inform this determination, the authorities are inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.

Written comments must be submitted by [insert deadline for receipt of comments] to:

Environment, Health and Safety

Public Services and Procurement Canada

11 Laurier St, Portage III, Place du Portage
Gatineau, QC  K1A 0S5

Email: TPSGC.RCNLVEEListedeControle-NCRECMPChecklist.PWGSC@tpsgc-pwgsc.gc.ca

The Proposed Project

As part of advanced planning for the Long Term Vision and Plan (LTVP) for the Parliamentary Precinct, PWGSC intends to redevelop the site and properties located at 100 Sparks and 30 Metcalfe Street. The current objectives are to identify and remove hazardous building components, disconnect and cap utilities, and deconstruct the buildings. At the end of the work, temporary landscaping will be put in place. As part of the site mobilization, the General Contractor will be installing construction site hoarding to ensure safe construction operations and to maintain public safety during the construction period.

 

Document reference number: 1

Date modified: