August 27, 2024  The Montreal Port Authority (MPA) has determined that the project « Optimization and upgrade of docks 100-101 of the Port of Montreal » is not likely to cause significant adverse environmental effects.

This determination was based on the following factors:

  • Impact on the rights of indigenous peoples;
  • Indigenous knowledge;
  • Comments received from the public;
  • Technically and economically feasible mitigation measures.

Mitigation measures taken into account for this determination are detailed in Document #1.

Therefore, the MPA may perform any duty or function to enable the project to be carried out in whole or in part.