Proponent's Submissions
Fish and fish habitat
- Condition 3.1 - Letter with Drawings
- Condition 3.1 - Temporary Erosion and Sediment Control Plan - Construction Phase 1
- Condition 3.9 - Fish and Fish Habitat Offset Measures Plan
- Condition 3.18 - Fish Rescue and Fish Health Monitoring and Mitigation
- Conditions 3.19 & 3.20 - Surface Water Monitoring Plan
Migratory birds
- Condition 4.5.1 - Bank Swallow Foraging Habitat Assessment
- Condition 4.5.2 - Bank Swallow Nesting Structure
- Conditions 4.11 & 8.4.1 - Wildlife Mitigation and Monitoring Plan
Species at risk
- Conditions 5.7 & 8.13 - Vegetation and Wetland Mitigation, Monitoring and Revegetation Plan
- Conditions 5.8 & 5.9 - Project Wetlands to be Removed or Avoided
Atmospheric environment
- Condition 6.2 - IAAC Approval Conditions - Start of Construction Activities
- Conditions 6.4 & 7.10 - Air Quality Management Plan
Human health
- Conditions 7.3, 7.4 & 11.6 - Project Communication Plan
- Condition 7.9 - Groundwater Monitoring Plan
- Conditions 6.4 & 7.10 - Air Quality Management Plan
Current use of lands and resources for traditional purposes
- Conditions 4.11 & 8.4.1 - Wildlife Mitigation and Monitoring Plan
- Conditions 8.7 & 9.6 - SR1 Project Design and Construction Footprint
- Conditions 5.7 & 8.13 - Vegetation and Wetland Mitigation, Monitoring and Revegetation Plan
- Condition 8.14 - Preliminary Approach for Monitoring and Evaluation of the Land Use Plan
Physical and cultural heritage and structures, sites or things of historical, archaeological, paleontological or architectural significance
- Conditions 9.3 & 9.9 - Archaeological and Heritage Management Plan
- Conditions 8.7 & 9.6 - SR1 Project Design and Construction Footprint
Accidents and malfunctions