Public Notice

McArthurGlen Designer Outlet Expansion Phase 3 – Public Comments Invited

May 10, 2024 The Vancouver Airport Authority must determine whether the proposed McArthurGlen Designer Outlet Expansion Phase 3, located at Vancouver International Airport is likely to cause significant adverse environmental effects.

To help inform this determination, the Vancouver Airport Authority is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.

Written comments must be submitted June 10, 2024 to:

Environment@yvr.ca

Vancouver Airport Authority

Climate and Environment

PO Box 44638 YVR

Domestic Terminal RPO

Richmond, British Columbia V7B 1W2
 

 

The Proposed Project

Templeton DOC Limited Partnership is proposing to expand the McArthurGlen Designer Outlet Vancouver Airport located at the Vancouver International Airport in Richmond, B.C. The expansion consists of approximately 6,130 square meters of new commercial retail buildings. Construction activities for the Phase 3 project will include some excavation of existing gravel base material, construction of new foundations, utilities and building structures. The operation of the expanded facility will be commercial retail, the same as the existing facility. This expansion was included in the original planning of the McArthurGlen Designer Outlet and the ground preparation for this Phase 3 expansion was completed in 2013 during the initial Phase 1 development of the site.

 

Document reference number: 1

Date modified: