Public Notice

Urgent Sanitary Pipe Repair and Contaminated Soil Abatement - Public Comments Invited

December 14, 2023The authority must determine whether the proposed Urgent Sanitary Pipe Repair and Contaminated Soil Abatement located at 22 Bay St., Sault Ste. Marie, ON P6A 5S2 is likely to cause significant adverse environmental effects.

To help inform this determination, the authority is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.

Written comments must be submitted by January 13, 2024 to:

Maegan Harrison
Public Services and Procurement Canada
4900 Yonge Street, North York, ON, M2N 6A4
maegan.harrison@pwgsc-tpsgc.gc.ca
416-434-9156

The Proposed Project

THIS PROJECT CANNOT BE EXCLUDED THROUGH THE IAA PROCESS, DUE TO SANITARY LINE BREACH AND IMPACT TO SOILS. A MITIGATION MEASURES FORM WILL BE REQUIRED. A sanitary branch approximately 2.5 to 3 feet below grade leaving the staff lunchroom on the ground floor has separated from the main sanitary line. The sanitary branch is fed by a 4 inch stack from the second floor that contains a group of change rooms, the ground floor lunchroom and a floor drain from room 003. It is recommended that the pipe be excavated and repaired as required and the joint and to be supported below grade. These supports shall prevent future separation of the sanitary branch from the main. There would be a combination of grey water and human waste leaking under the ground floor slab. It is recommended that repairs to the sanitary piping be made immediately and contaminated soil abated. An Environmental consultant will be required to determine extent of contamination and provide a scope to abate contaminated soil.

Document reference number: 1