Suncor Base Mine Extension Project
From the Impact Assessment Agency of Canada to Suncor Energy Inc. re: Reminder of three-year time limit to submit required information and studies under the IAA
To download the document, click on the link below. Please contact us for assistance or to obtain an alternative format at registry-registre@iaac-aeic.gc.ca.
From the Impact Assessment Agency of Canada to Suncor Energy Inc. re: Reminder of three-year time limit to submit required information and studies under the IAA
(PDF, 188 KB)
Document reference number: 162
For questions or information, please contact:
Suncor Base Mine Extension Project
Impact Assessment Agency of Canada
160 Elgin St, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 343-549-5813
Email: basemine-minebase@iaac-aeic.gc.ca
Project reference number: 80521