Public Comment Period on Intent to Make a Determination
8-5-18-6 Pipeline Installation – Canadian Forces Base (CFB) Suffield

February 23, 2022 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by March 4, 2022 to:
Mr. Danny Laganiere, Base Environmental Officer
Mailing Address:  CFB Suffield, Box 6000 St Main, Medicine Hat
Alberta, Canada, T1A 8K8
E-mail:  Danny.Laganiere@forces.gc.ca

or


IPC Canada Ltd.
E-mail:  regulatory.ca@international-petroleum.com

The Proposed Project

International Petroleum Corp. IPC Canada Ltd is proposing to install a gas pipeline on an existing site with CFB Suffield. This project is in support of existing fluid streams currently handled at the facility. The plastic pipeline is approximately 2 inches in diameter, and 40 meters in length. The pipeline will be trenched, and does not require new land as it is contained within a developed and previously assessed site. The installation will be completed in approximately two days in association with other operational facility work.