Public Comment Period on Intent to Make a Determination
New Electrical Distribution Line and Installation of Parking Outlets – Canadian Forces Base (CFB) Bagotville

November 6, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by November 16, 2021 to:
Michel Lajoie, Environment Officer
Mailing Address:  Canadian Forces Base Bagotville, PO Box 5000
Alouette, QC, Canada, G0V 1A0
E-mail:  michel.lajoie@forces.gc.ca

The Proposed Project

The Department of National Defence (DND) has proposed a project which involves work execution, labor supply, materials and tools necessary for a new distribution line installation; for the addition of parking electrical outlets in the petroleum park area. The work involves, but is not limited to: approximately 40 meters of soil excavation for the addition of an underground power supply, a new distribution panel and the installation of approximately five parking electrical outlets on existing guardrails. Contaminated soils will be disposed off-site and granular material will be imported to backfill the excavations.

Document Reference Number: 1

Date modified: