Public Comment Period on Intent to Make a Determination
15-8-17-6 Installation of a Gas Pipeline

April 28, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by May 17, 2021 to:
Mr. Danny Laganiere, Base Environment Officer, Canadian Forces Base Suffield
Mailing address: CFB Suffield, Box 6000 Station Main, Medicine Hat, AB T1A8K8
Email address: danny.laganiere@forces.gc.ca

or

Joel Heese, Environment and Regulatory Advisor, IPC Canada Ltd.
1711 Broadway Ave East, Redcliff, AB T0J 2P0
Email address: joel.heese@international-petroleum.com

The Proposed Project

IPC Canada Ltd. is proposing to install a gas pipeline on an existing facility site with CFB Suffield. This operations project is in support of existing fluid streams currently handled at the facility. The 2 inch plastic pipeline is approximately 80 metres long, will be trenched, and does not require new lands as it is contained within a developed and previously assessed facility site. The installation will be completed in approximately two days in association with other operational facility work.

Document Reference Number: 1

Date modified: